425-821-4945
425-821-4945

Sources: after postponing construction at the end of 2022, Intel seeks an extra €4B-€5B from Germany to build its chip plant, taking the expected cost to ~€30B (Bloomberg)

Bloomberg:
Sources: after postponing construction at the end of 2022, Intel seeks an extra €4B-€5B from Germany to build its chip plant, taking the expected cost to ~€30B  —  Intel Corp. is seeking an additional 4 billion to 5 billion euros in subsidies from the German government …

Generated by Feedzy